Following are the major projects/activities ongoing/planned in TPO Asset during 2011:

  • New Fujairah ADCOP Project:
    ADCO has been nominated to operate and to proceed with the preparations for the pre-commissioning/commissioning, start-up, performance testing and handover of the project facilities.
  • Refurbishment of crude oil storage tanks, (Tanks T1511 & T1506):
    To maintain the integrity of the storage tanks as per the maintenance plan.
  • JD Gravity Line protection:
    Mitigation measures to protect the gravity lines by installing reinforced concrete slabs above the gravity lines, along the section of pipelines for the planned extension of JD Airport runway.
  • Construction of 4 Nos. Internal Corrosion Monitoring Pits and Monitoring at NEB and Romaitha Lines:
    In order to have accurate Risk Based Assessment (RBA) and Remnant Life Assessment of the lines
  • Repair of storage tank bund walls:
    In order to maintain its purpose of containing and directing any spilled oil to avoid any unfavorable escalation of any leak accident and reduce any adverse environmental consequences.
  • Oil Spill Center and Jetty Sub stations:
    The purpose of the center is to ensure immediate response for any offshore oil spill.
  • JDA Tier 1 Oil spill response capability service:
    To ensure the availability of the right Tier -1 Oil Spill response capabilities at Jebel Dhanna Terminal inline with ADNOC Code of Practice (CoP) V5-02.
  • Upgrading of Fire Training Ground to SHELL DEP Standard:
    The existing fire ground needs to be upgraded to have the SHELL DEP standard by adding additional facilities.